Transshipment & Inland Grains Terminal
Owner |
: |
Middle East River Transportation Co.( MERT ) ( Kharafi group ) |
TCB Role |
: |
Complete design site supervision ( under study ) |
300 ton slipway on the River Nile & Tebbin – Helwan
The slipway is designed to accommodate 300 t fluvial ships, together with a yard for 8 units.
The system consists of hydraulic winch, steel trolley etc .. . the slipway is served by following facilities :
workshops for inspection and maintenance of motors, as well shopping of steel plates , forging , foundry and painting
TCB Role |
: |
complete design, construction supervision |
Railways, locomotives and wagons Workshops
Project |
: |
A railway line between Mecheria and Bechar of 360 km is under design and construction. There are Three (3) workshops realized to maintain the locomotives and wagons of this line. These workshops are located at Mecheria, Bechar and Ain Sefra. |
Owner |
: |
Algerian National Railways |
TCB Role |
: |
Detailed civil designs (Architectural, Structural, EM, Water sanitary, Plumping, Fire fighting, and Telecommunication, Tracks and Roads
|
|