Greater Cairo Underground Metro Line 1 (Tura)
Project |
: |
Development and Modernization of the Tura Workshop for Cairo Metro Units
TCB carried out the modifications needed for Tura workshop to cover a multitude of tasks which tackle all aspects of the Metro Unit modern repair workshop in Tura. |
TCB Role |
: |
TCB is designing a modern workshop, including conducting all the studies relevant to the machines, equipments, track, pantographs needed. All the civil tasks are also carried out. |
Owner |
: |
Ministry of Transport |
|